Assaluyeh-Kangan 56-inch gas pipeline project
Description
Assaluyeh-Kangan 56-inch gas pipeline project
Type
Construction of a 56-inch gas transmission line
Project size
Construction of a 56-inch gas transmission line with an approximate length of 97 km
Employer
Iran Gas Engineering and Development Company
Year of implementation
1999
Project description
The length of the line is about 97 km
Provide sufficient manpower to build accessories and deploy the required equipment and prepare them to start work
Welding of sheath pipes and ventilation of underpasses
Piping pipe "56 in the sheath of underpasses
Welding of connections and tie-ins
Welding and branching welding repairs
Welding of pipes at the entrance of stations to the place of the first valve "56 stations
Collaborate on final connections and HOT TAP
Perform pipe bending operations
Perform line welding based on drawings, technical specifications and welding methods prepared by the employer
Providing and employing specialized personnel to carry out executive operations
Perform line radiography under the supervision of the employer