Lomar power line project and route villages

Description
Lomar power line project and route villages

Project Type
Execution of steel feeding network and installation of all connections and valves and related accessories and construction of ponds and installation of identification signs

Project size
Execution of steel feeding network and installation of all fittings and valves and related accessories and construction of ponds and installation of identification signs with an approximate length of 19 km

Employer
Ilam Province Gas Company

Year of implementation
2011
Project description
a) PSI 250 main line network
Execution of steel feeding network with pipes with diameters of "4 and" 12 with a pressure of 250 PSI and installation of all fittings and valves and related fittings and construction of ponds and installation of identification signs completely and approximately 18777 meters long line Nutrition
Piping steel pipe "4 with a length of 1200 meters
Piping steel pipe "12 with a length of 17577 meters
Crossing the water atmosphere, installing valve position switchboard, installing three ways of evacuation and aeration and two cases of pipe passage "12 through a total length of 60 meters and two cases of pipe passage" 4 through a total length of 20 meters
Crossing the width of the main road, three pipes "12 in total with a length of 35 meters
Crossing the river three cases of pipe "12 in total length of 220 meters
17 km long and 10 m wide
Taking information before burial and measuring and recording the position of pipes, valves and fittings and drawing a sketch of the work performed
Prepare a work plan executed as built with a scale of 1: 1000
Leak test and resistance of water supply line (hydrostatic test) and elimination of all defects according to the technical specifications of the National Gas Company
Making a video and doing a radiograph of the welds and fixing the defects and defects of the welds
Final connection of the power supply line and gas injection and commissioning under the supervision of the employer
Preparation and supply of insulation materials and insulation of project pipes of hot type
Measurement and testing of electrical resistance of pipeline coating according to the standards of the National Gas Company
Installation of all valves and fittings and construction of valve pool and installation of signs indicating the position of valves and identification signs according to the technical specifications and standard drawings of the National Gas Company
Air evacuation, cleaning of the implemented line and gas injection and elimination of defects up to the operation stage
Reconstruction of piping route except repair of asphalt, concrete and mosaic
Preparation and supply of asbestos or steel pipe for installation in drainage paths
b) T.B.S pressure relief station
Installation of a cabinet pressure reducing station (T.B.S) with a capacity of 1000 cubic meters per hour and a unit with a capacity of 2500 cubic meters per hour with pressure and input PSI 250 and output pressure PSI 60