Project to complete the defects of Charmashdash, Viq and Horan stations

Description
Project to complete the defects of Charmashdash, Viq and Horan stations

Project Type
Completion of pressure reduction stations

Project size
Completion of leather pressure reduction stations

Employer
East Azerbaijan Province Gas Company

Year of implementation
2019
Project description
Preparation of materials and construction of the station building with dimensions of 13 * 10 with metal structure and 22 cm walls with high quality pressure bricks
Preparation of materials and installation of galvanized sheets with dimensions of 13 * 10 with metal substructure and sloping roof
Preparation of masonry materials for the entrance facade and the station building itself with ax travertine stone and execution of the surrounding base of double blade stone
Preparation of materials and cementing and hail (white) The interior of the facility room with dimensions of 13 * 10
Preparation of materials and execution of the front part of the console around the facade covered with Rabitz sheet and coated with cement sand
Find 13 x 10 dimensions under the outer walls and station building
Preparation of materials and foundations with broken stone and between 150 carats with dimensions of 13 * 10
Forming of shingles with dimensions of 13 * 10 under the walls of the yard and station building according to the plan
Preparation of materials and execution of reinforcement and concreting of shingles with dimensions of 13 * 10 with 300 grade concrete according to the plan
Preparation of materials and execution of the page under the columns with dimensions of 1.5 * 04.0 * 4. With 20 bolts
Substation of the station floor and preparation of materials and concreting with reinforcement with 300 grade concrete in the installation room with dimensions of 13 * 10 according to the plan
Preparation of materials and implementation of substructure by concreting and mixing river tobacco before asphalt or concreting
Preparation of materials and execution of asphalt inside the station with dimensions of 13 * 10 according to the plan
Preparation of materials and construction of metal doors, entrance doors and station building according to the plan
Materials and execution of metal windows with dimensions of 12 * 10 in the installation room according to the plan