56 Inch Gas Transmission Line Project Phase 2 A
Description
56 Inch Gas Transmission Line Project Phase 2 A
Type
Construction of a 56-inch gas transmission line
Project size
Construction of a 56-inch gas transmission line with a length of approximately 99 km
Employer
Iran Gas Engineering and Development Company
Year of implementation
1990
Project description
The length of the line is about 99270 meters
Start of the line from the end of the existing pipeline "56 is adjacent to the pressure boosting station No. 3 of the National Iranian Gas Company located in Pol-e Koleh of Isfahan and the completion of the work is inside the station No. 4 located in Dehq area
Provide sufficient manpower to build accessories and deploy the required equipment and prepare them to start work
Repair and chamfer of pipes is necessary by the contractor
Welding of sheath pipes and ventilation of underpasses
Piping pipe "56 in the sheath of underpasses
Welding of connections and tie-ins
Welding and branching welding repairs
Welding of pipes at the entrance of stations to the place of the first valve "56 stations
Cooperation in final connections and HOT TAP
Perform pipe bending operations
Perform line welding based on drawings, technical specifications and welding methods prepared by the employer
Providing and employing specialized personnel to carry out executive operations
Perform line radiography under the supervision of the employer