Power supply line and urban network project of phase A1 of Shahin Dej city
Description
Power supply line and urban network project of phase A1 of Shahin Dej city
Type
Construction of power line and urban network
Project size
Construction of power line and urban network with a length of 47 km
Employer
West Azerbaijan Province Gas Company
Year of implementation
2002
Project description
Network 4 times
Piping steel pipes with a diameter of 4 to 8 inches, 4 bar network and installing valve connections and accessories related to the construction of the pond and installing identification signs 180 meters long
Piping polyethylene pipes with a diameter of 63 to 160 mm, 4 bar network and installing connections of valves and accessories related to the construction of the pond and installation of identification signs with a length of 39802 meters
The field of activity and the most important capabilities of Keyvan Koosha Company are listed as follows.
Radiography of the welds and preparation of all materials required for the project Testing of polyethylene welds in the research institutes of the National Gas Company under the supervision of the company's technical inspector Connect the implemented network to the output of the TBS pressure relief station Cross the 160 mm pipe according to the standard plan