Project of preparation, equipment and implementation of power supply line and gas distribution network of Shams Abad industrial town "Appendix"


Description

Project of preparation, equipment and implementation of power supply line and gas distribution network of Shams Abad industrial town "Appendix"


Type

Procurement of equipment and implementation of power supply line and gas distribution network


Project size

Procurement of equipment and implementation of power line and gas distribution network with a length of 38 km


Employer

Iran Small Industries and Industrial Parks Organization


Year of implementation

2011

Project description


Work area includes the area specified in the map approved by the Tehran Province Gas Company in Shams Abad Industrial Town

Preparation of materials and complete operations with steel pipe with a diameter of 4 to 16 inches for the network with a pressure of 60psi and 250psi and installation of fittings, flanges, valves and related accessories, construction of ponds and installation of identification signs with a length of about 38,000 meters

Carrying out all tests including third party elements to obtain approval of all project goods, commissioning, gas injection and air discharge based on the method developed by the contractor and with the approval of the monitoring device in accordance with the technical specifications and criteria of the National Iranian Gas Company

Complete retrieval of information before burial and preparation of work maps (azbilt) in the necessary scales and the relevant computer diskette under the AutoCAD program according to the standard developed by the gas company

Provide all machinery and equipment, and manpower, as well as all services required to complete the work and provide a vehicle for the monitoring team throughout the work