Construction of 8-inch Larestan Cement gas transmission line
Description
Construction of 8-inch Larestan Cement gas transmission line
Project Type
Construction of 8-inch gas transmission pipeline
Project size
Construction of an 8-inch gas transmission pipeline with an approximate length of 35 km
Employer
Iran Gas Engineering and Development Company
Year of implementation
2019
Project description
Complete construction of pipeline "8 from about 83 km of 12 inch Lar line to Larestan cement ball receiving station with an approximate length of 35 km and carrying out executive operations according to executive plans
Construction of Topak transceiver station (all valves and related fittings and any equipment required) Must be provided and installed by the contractor)
Construction of one way stations and a branch on the main line
Construction of 1 cathodic protection station
Construction of CGS / TBS stations with 1 station in the branch of Hassan Lori industrial towns and behind the trench
Construction of measuring stations with 1 station after the ball receiving station